Lesso America

ABS DWV Test Tee (HUB x HUB x Cleanout W/ Plug)

(No reviews yet) Write a Review
SKU:
LN444X
Availability:
Usually Ships Same Day
Weight:
0.00 LBS
*Images are for visual reference only.
  • ABS DWV Test Tee (HUB x HUB x Cleanout W/ Plug)
  • ABS DWV Test Tee (HUB x HUB x Cleanout W/ Plug)
$5.65 - $21.27

Represents the combined quantity sold of all the sizes under this product SKU.
Sold:
Frequently bought together:

Description

ABS DWV Test Tee (HUB x HUB x Cleanout W/ Plug)

ABS DWV Test Tees with Cleanout Plug provide an accessible cleanout and testing point within non-pressure drain, waste, and vent systems.

Featuring two hub connections for the main piping run and a cleanout branch with removable plug, this fitting allows convenient access for system inspection, maintenance, cleaning, and approved DWV testing procedures. The main hubs accept compatible ABS DWV pipe for solvent-cement installation, while the cleanout opening provides a serviceable access point without requiring the piping system to be cut apart. Manufactured for ABS DWV service, it meets recognized standards including ASTM D2661, CSA B181.1, and NSF Standard 14.

Product Highlights

  • ABS DWV test tee with cleanout plug
  • Hub x Hub x Cleanout with Plug configuration
  • Two hub connections form the main piping run
  • Includes a removable cleanout plug
  • Provides convenient access for cleaning and maintenance
  • Useful for approved DWV system testing procedures
  • Allows system access without cutting the pipe
  • Hub connections accept compatible ABS DWV pipe
  • Designed for solvent-cement installation
  • Suitable for drain, waste, and vent systems
  • Suitable for sewer and general drainage applications
  • Non-pressure fitting
  • Maximum operating temperature of 140°F
  • Not intended for transporting compressed air or gas
  • Manufactured from virgin ABS polymers
  • Complies with ASTM D2661
  • Certified to CSA B181.1
  • Meets NSF Standard 14 requirements

Technical Specifications

Product Type ABS DWV Test Tee with Cleanout Plug
Material ABS
Connection Type Hub x Hub x Cleanout with Plug
Main Run Connections 2 Hub Connections
Access Connection Cleanout Opening with Removable Plug
Joint Method Solvent Cement at Hub Connections
System Type Drain, Waste, and Vent (DWV)
Pressure Service Non-Pressure
Maximum Operating Temperature 140°F
Primary Function Provide Cleanout, Inspection, Maintenance, and Test Access within an ABS DWV Piping Run
Referenced Standards ASTM D3965, ASTM D2661, CSA B181.1, NSF Standard 14
Typical Applications Sanitary Drainage, Waste Lines, Vent Systems, Sewer, General Drainage, Cleanout Access, and DWV Testing

Connection Configuration

Main Run Hubs

The two hub connections form the primary piping run and accept compatible ABS DWV pipe for permanent solvent-cement installation.

Cleanout with Plug

The branch opening includes a removable plug that provides access to the interior of the piping system for cleaning, inspection, maintenance, and applicable testing procedures.

Cleanout & Test Access Design

The cleanout branch provides a dedicated service opening within the ABS DWV piping run.

When access is required, the removable plug can be opened to allow inspection or cleaning equipment to enter the piping system without cutting or disassembling the main run.

The cleanout opening may also be used as part of approved DWV testing procedures when permitted by the manufacturer's instructions and applicable plumbing codes.

Why Choose an ABS DWV Test Tee with Cleanout Plug?

Service Access

  • Provides dedicated cleanout access
  • Includes removable plug
  • Allows easier inspection and maintenance
  • Can provide access for drain-cleaning equipment
  • Reduces the need to cut into the piping system

Installation Benefits

  • Two hub connections form a straight main run
  • Compact three-opening configuration
  • Compatible with ABS DWV piping systems
  • Suitable for non-pressure drainage service
  • Designed for solvent-cement installation

Typical Applications

Drainage Systems

  • Sanitary drain lines
  • Waste piping
  • Sewer piping
  • General building drainage
  • ABS DWV piping runs

Access & Maintenance

  • Cleanout access points
  • Drain inspection
  • System cleaning
  • Maintenance access
  • Approved DWV testing procedures

Standards & Compliance

  • ASTM D3965: ABS material requirements for pipe extrusion and molded fittings
  • ASTM D2661: Schedule 40 ABS drain, waste, and vent pipe and fittings
  • CSA B181.1: ABS drain, waste, and vent pipe, fittings, and accessories
  • NSF Standard 14: Plastic piping system components and related materials

Installation

Verify the nominal hub sizes and cleanout configuration before installation and confirm that the cleanout opening will remain accessible after the piping system is completed.

Cut both mating ABS pipe ends square and remove burrs. Clean and prepare the pipe and hub surfaces according to accepted ABS solvent-cement installation procedures.

Dry-fit the assembly first to confirm the orientation of the cleanout opening and ensure sufficient clearance for future plug removal and maintenance access.

Apply compatible ABS solvent cement as required and fully seat each pipe into its corresponding hub while maintaining proper alignment.

Install and secure the cleanout plug according to the manufacturer's instructions. Allow completed solvent-cement joints to cure according to the solvent cement manufacturer's recommendations before testing or placing the system into service.

Willy knows his pipe fittings
Ask Willy: Need Help Selecting an ABS DWV Test Tee with Cleanout Plug?

Our piping specialists can help review your pipe size, cleanout location, access requirements, and ABS DWV compatibility before you order.

Email the GetPipe.com Team Visit Quick Support

Frequently Asked Questions

What is an ABS DWV test tee with cleanout plug used for?

It provides an accessible opening in an ABS DWV piping run for inspection, cleaning, maintenance, and applicable system testing procedures.

What does HUB x HUB x Cleanout with Plug mean?

It means the fitting has two hub connections for the main piping run and a separate cleanout opening equipped with a removable plug.

What is the purpose of the cleanout plug?

The plug closes the cleanout opening during normal operation and can be removed when access to the piping system is needed.

Can the cleanout be used for drain cleaning?

Yes. The cleanout opening provides an access point that may be used for inspection and appropriate drain-cleaning procedures.

Can this fitting be used for DWV system testing?

The supplied product information identifies the fitting for testing access. Any testing should follow applicable plumbing codes, manufacturer instructions, and approved DWV testing methods.

Does this fitting require solvent cement?

Yes. The two hub connections are intended for compatible ABS solvent-cement installation.

Is this fitting intended for pressure piping?

No. It is intended for non-pressure drain, waste, vent, sewer, and general drainage systems.

Can it be used for compressed air or gas?

No. The supplied product information states that the fitting is not intended for transporting compressed air or gas.

What is the maximum operating temperature?

The supplied product information specifies applications where operating temperatures do not exceed 140°F.

What should I verify before ordering?

Confirm both hub sizes, cleanout plug configuration, required cleanout location, future access clearance, and intended non-pressure ABS DWV application.

Important Ordering & Installation Notes

  • This listing is for an ABS DWV Test Tee with HUB x HUB x Cleanout with Plug connections.
  • Verify both nominal hub sizes before ordering.
  • The fitting includes a removable cleanout plug.
  • Confirm that the cleanout opening will remain accessible after installation.
  • Provide sufficient clearance for future plug removal and service access.
  • Two hub connections form the main ABS DWV piping run.
  • Use the cleanout opening only for appropriate inspection, maintenance, cleaning, or approved testing procedures.
  • Dry-fit the complete assembly before applying solvent cement.
  • Confirm cleanout orientation before final installation.
  • This fitting is intended for non-pressure DWV, sewer, and general drainage applications.
  • Do not use for transporting compressed air or gas.
  • Maximum operating temperature is 140°F.
  • Use compatible ABS solvent cement for hub installation.
  • Cut pipe square and remove burrs before assembly.
  • Clean and prepare all mating surfaces before solvent-cement installation.
  • Fully seat each ABS pipe into its corresponding hub.
  • Install and secure the cleanout plug according to manufacturer instructions.
  • Maintain proper main-run and cleanout alignment during installation.
  • Allow completed joints to cure according to the solvent cement manufacturer's recommendations before testing or service.
  • Protect the fitting from incompatible chemicals, fire-stopping materials, thread sealants, and other aggressive agents that may damage ABS compounds.
  • Consult manufacturer documentation for complete dimensions, cleanout details, and installation requirements.
  • Follow applicable plumbing codes and manufacturer installation recommendations.

Product Documents

View AllClose

Reviews