Spears

Schedule 80 CPVC WYE Socket Connection (235 PSI)

(No reviews yet) Write a Review
Availability:
Usually Ships Same Day
Weight:
0.00 LBS
*Images are for visual reference only.
  • Schedule 80 CPVC WYE Socket Connection (235 PSI)
  • Spears Logo
$7.13 - $955.57

Represents the combined quantity sold of all the sizes under this product SKU.
Sold:
Frequently bought together:

Description

Schedule 80 CPVC WYE Socket Connection (235 PSI)

Schedule 80 CPVC WYE Socket Connection (235 PSI) provides an angled branch connection within compatible CPVC piping. The wye configuration uses socket connections for solvent-cement joining and is identified with a 235 PSI pressure rating.

The Schedule 80 CPVC WYE creates a branch that enters the main piping path at an angle rather than at a perpendicular tee connection. Selection should account for nominal connection sizes, socket compatibility, branch orientation, 235 PSI rating, system conditions, and proper CPVC joining procedures.

Product Highlights

  • CPVC construction
  • Schedule 80 design
  • 235 PSI rating
  • WYE configuration
  • Socket connections
  • Provides an angled branch path
  • Designed for compatible CPVC pipe
  • Designed for solvent-cement CPVC joining

Technical Specifications

Product Type WYE
Material CPVC
Schedule Schedule 80
Configuration WYE Branch Fitting
Connection Socket (SOC)
Socket Interface Compatible CPVC Pipe
Pressure Rating 235 PSI
Branch Style Angled WYE Branch
Joining Method CPVC Solvent-Cement Connections
Primary Function Provide an Angled Branch Connection in Compatible CPVC Piping

WYE Design

The WYE design creates an angled branch from the main piping path. This configuration provides a more gradual branch transition than a perpendicular tee-style connection.

The branch direction should be established before installation because fitting orientation determines the resulting piping layout. All adjoining connection sizes should be confirmed before solvent-cement assembly.

Socket Connections

The socket connections accept appropriately sized compatible CPVC pipe at the fitting openings. These interfaces are designed for solvent-cement joining within the piping system.

Pipe ends and fitting sockets should be clean and properly prepared before assembly. Compatible CPVC primer, solvent cement, insertion procedures, and required cure times should be followed.

Angled Branch Connection

The angled branch configuration allows a secondary piping run to merge with or branch from the main run through the wye geometry. Proper orientation helps establish the intended piping direction before permanent joining.

Connected piping should be aligned and independently supported to limit external loading on the fitting. The fitting should not be used to pull misaligned pipe into position.

Schedule 80 CPVC Application

A Schedule 80 CPVC WYE Socket Connection provides a molded branch fitting for compatible CPVC piping systems. This configuration is identified with a 235 PSI pressure rating.

System temperature, pressure, fluid compatibility, joining requirements, and applicable installation procedures should be reviewed for the intended application. Proper support should be maintained around the main and branch piping runs.

Installation & Selection Considerations

  • Confirm all nominal sizes.
  • Verify the socket connections.
  • Confirm the 235 PSI rating.
  • Check branch orientation before joining.
  • Support main and branch piping.
Willy knows his pipe sizes
Ask Willy: Need Help Selecting a Schedule 80 CPVC WYE?

Our piping specialists can help review connection sizes, socket compatibility, branch orientation, 235 PSI requirements, adjoining CPVC pipe, and installation considerations before you order.

Frequently Asked Questions

What is a Schedule 80 CPVC WYE used for?

It provides an angled branch connection within compatible CPVC piping.

What type of connections does this WYE use?

The fitting uses socket connections designed for compatible CPVC pipe and solvent-cement joining.

What is the pressure rating?

This WYE configuration is identified with a 235 PSI pressure rating.

How does a WYE differ from a tee?

A WYE creates an angled branch path rather than the perpendicular branch arrangement associated with a standard tee.

How are the socket connections installed?

The sockets are designed for compatible CPVC solvent-cement joining using appropriate preparation, joining materials, and cure procedures.

What should I confirm before ordering?

Confirm all nominal sizes, socket configuration, 235 PSI rating, branch orientation, adjoining CPVC pipe, and system requirements.

Important Ordering & Installation Notes

  • Confirm all nominal sizes.
  • Verify all socket connections.
  • Confirm the 235 PSI rating.
  • Check branch orientation.
  • Use compatible CPVC joining procedures.
View AllClose

Reviews