Spears

Schedule 80 PVC 2000 Union EPDM (SOC x SPIG)

(No reviews yet) Write a Review
Availability:
Usually Ships Same Day
Weight:
0.00 LBS
*Images are for visual reference only.
  • Schedule 80 PVC 2000 Union EPDM (SOC x SPIG)
  • Spears Logo
$5.58 - $141.55

Represents the combined quantity sold of all the sizes under this product SKU.
Sold:
Frequently bought together:

Description

Schedule 80 PVC 2000 Union EPDM (SOC x SPIG)

Schedule 80 PVC 2000 Union EPDM (SOC x SPIG) provides a removable connection using one socket connection and one spigot connection. The socket end receives appropriately sized compatible PVC pipe, while the spigot end fits into an appropriately sized compatible receiving socket.

The SOC x SPIG union configuration combines two solvent-cement connection interfaces with EPDM sealing material. Selection should account for nominal size, Schedule 80 PVC compatibility, adjoining components, connection orientation, EPDM compatibility, joining requirements, piping alignment, and available service clearance.

Product Highlights

  • PVC construction
  • EPDM sealing material
  • Schedule 80 design
  • Union configuration
  • Socket x spigot connections
  • Provides a removable piping connection
  • Combines socket and spigot connection interfaces
  • Allows connected piping sections to be separated at the union

Technical Specifications

Product Type Union
Material PVC
Schedule Schedule 80
Connection Socket x Spigot (SOC x SPIG)
Connection Count Two
Fitting Configuration 2000-Series Union
Socket Interface Compatible PVC Pipe
Spigot Interface Compatible Receiving Socket
Sealing Material EPDM
Connection Style Socket x Spigot
Joining Method Compatible PVC Solvent-Cement Joining
Primary Function Provide a Removable Connection Between Compatible PVC Components

Union Design

The union configuration provides a connection point that can be separated when access to adjoining piping or equipment is required. This can simplify servicing or piping changes because the connection can be opened without cutting the connected pipe.

The union should be positioned where there is adequate room for assembly, disassembly, and future access. Adjoining piping should be aligned and supported so the union is not relied upon to correct offsets or carry unnecessary mechanical loads.

Socket & Spigot Connections

The socket connection receives appropriately sized compatible PVC pipe, while the spigot connection fits into an appropriately sized compatible receiving socket. This SOC x SPIG arrangement provides two compatible solvent-cement connection interfaces around the removable union body.

The mating surfaces should be prepared using the appropriate PVC solvent-cement joining procedure. Compatible joining materials, proper insertion, careful alignment, and planned fitting orientation help establish the connections without placing unnecessary stress on the union.

Schedule 80 PVC Integration

The Schedule 80 PVC construction allows the union to integrate into compatible Schedule 80 PVC piping arrangements requiring SOC x SPIG connections. Matching the nominal size and both connection interfaces to the adjoining components helps maintain the intended piping configuration.

Application suitability should be evaluated using the requirements of the complete piping system rather than the schedule designation alone. Intended service conditions, adjoining materials, connection compatibility, sealing materials, joining materials, piping support, and applicable practices should all be considered during fitting selection.

EPDM Sealing Configuration

The EPDM sealing material is part of the union sealing configuration and should be evaluated for compatibility with the intended service. Seal-material selection can depend on the conveyed media, temperature, operating conditions, and other application requirements.

The sealing surfaces and EPDM seal should be inspected before assembly and kept free from damage or contamination. The union should be assembled evenly so the sealing components remain correctly positioned during installation and future servicing.

Installation & Selection Considerations

  • Confirm the nominal size.
  • Verify the SOC x SPIG arrangement.
  • Check Schedule 80 PVC compatibility.
  • Confirm EPDM suitability for the application.
  • Allow adequate clearance for union servicing.
Willy knows his pipe sizes
Ask Willy: Need Help Selecting a Schedule 80 PVC 2000 Union EPDM?

Our PVC fitting specialists can help review your nominal size, Schedule 80 requirements, SOC x SPIG configuration, EPDM sealing material, adjoining PVC components, joining requirements, union orientation, piping layout, support requirements, and available service clearance before you order.

Frequently Asked Questions

What is a Schedule 80 PVC 2000 Union EPDM used for?

It provides a removable connection between compatible PVC components using socket and spigot connections.

What does SOC mean?

SOC identifies a socket-style connection designed to receive appropriately sized compatible PVC pipe.

What does SPIG mean?

SPIG identifies a spigot-style connection designed to fit into an appropriately sized compatible receiving socket.

What does EPDM identify?

EPDM identifies the specified sealing material used in the union and should be checked for compatibility with the intended application.

Why use a union connection?

A union provides a connection point that can be separated for access or servicing without requiring the adjoining pipe to be cut.

What should I confirm before ordering?

Confirm the nominal size, SOC x SPIG arrangement, Schedule 80 PVC compatibility, EPDM sealing requirements, and adjoining components.

Important Ordering & Installation Notes

  • Inspect the union before use.
  • Confirm the nominal connection size.
  • Verify EPDM compatibility for the application.
  • Align adjoining piping before final assembly.
  • Allow clearance for future union servicing.
View AllClose

Reviews