Spears

Schedule 80 EPDM Union 2000 (SOC x SOC)

(No reviews yet) Write a Review
Availability:
Usually Ships Same Day
Weight:
0.00 LBS
*Images are for visual reference only.
  • Schedule 80 EPDM Union 2000 (SOC x SOC)
  • Spears Logo
  • Schedule 80 EPDM Union 2000 (SOC x SOC)
$5.58 - $141.55

Represents the combined quantity sold of all the sizes under this product SKU.
Sold:
Frequently bought together:

Description

Schedule 80 EPDM Union 2000 (SOC x SOC)

Schedule 80 EPDM Union 2000 (SOC x SOC) provides a removable connection between compatible Schedule 80 PVC pipe sections using socket connections at both ends. The union configuration allows connected piping sections to be separated at the union without requiring the adjoining pipe to be cut.

The SOC x SOC union configuration combines two socket connection interfaces with EPDM sealing material. Selection should account for nominal size, Schedule 80 PVC compatibility, adjoining pipe, EPDM compatibility, joining requirements, union orientation, piping alignment, support, and available service clearance.

Product Highlights

  • PVC construction
  • Socket connections
  • EPDM sealing material
  • Schedule 80 design
  • Union 2000 configuration
  • Provides a removable piping connection
  • Connects compatible PVC pipe sections
  • Allows connected piping sections to be separated without cutting the pipe

Technical Specifications

Product Type Union
Material PVC
Schedule Schedule 80
Connection Socket x Socket (SOC x SOC)
Connection Count Two
Fitting Configuration Union 2000
Connection Interface Compatible PVC Pipe
Sealing Material EPDM
Connection Style Socket x Socket
Joining Method Compatible PVC Solvent-Cement Joining
Piping Configuration Removable Straight Connection
Primary Function Provide a Removable Connection Between Compatible Schedule 80 PVC Pipe Sections

Union Design

The union configuration provides a connection point that can be separated when access to adjoining piping or equipment is required. This can simplify servicing or piping changes because the union can be opened without cutting the connected PVC pipe.

The union should be positioned where there is adequate room for assembly, disassembly, and future access. Adjoining piping should be aligned and supported so the union is not relied upon to correct offsets or carry unnecessary mechanical loads.

Socket Connections

The socket connections receive appropriately sized compatible PVC pipe at both ends of the union. This SOC x SOC arrangement provides a consistent connection style around the removable union body.

The mating pipe and socket surfaces should be prepared using the appropriate PVC solvent-cement joining procedure. Compatible joining materials, proper insertion, careful alignment, and planned union orientation help establish the connections without placing unnecessary stress on the fitting.

Schedule 80 PVC Integration

The Schedule 80 PVC construction allows the union to integrate into compatible Schedule 80 PVC piping arrangements requiring socket connections on both ends. Matching the nominal size and socket interfaces to the adjoining PVC pipe helps maintain the intended piping configuration.

Application suitability should be evaluated using the requirements of the complete piping system rather than the schedule designation alone. Intended service conditions, adjoining materials, connection compatibility, sealing materials, joining materials, piping support, and applicable practices should all be considered during fitting selection.

EPDM Sealing Configuration

The EPDM sealing material is part of the union sealing configuration and should be evaluated for compatibility with the intended service. Seal-material selection can depend on the conveyed media, temperature, operating conditions, and other application requirements.

The sealing surfaces and EPDM seal should be inspected before assembly and kept free from damage or contamination. The union should be assembled evenly so the sealing components remain correctly positioned during installation and future servicing.

Installation & Selection Considerations

  • Confirm the nominal size.
  • Verify both socket connections.
  • Check Schedule 80 PVC compatibility.
  • Confirm EPDM suitability for the application.
  • Allow adequate clearance for union servicing.
Willy knows his pipe sizes
Ask Willy: Need Help Selecting a Schedule 80 EPDM Union 2000?

Our PVC fitting specialists can help review your nominal size, Schedule 80 requirements, SOC x SOC configuration, EPDM sealing material, adjoining PVC pipe, joining requirements, union orientation, piping alignment, support requirements, and available service clearance before you order.

Frequently Asked Questions

What is a Schedule 80 EPDM Union 2000 used for?

It provides a removable connection between compatible Schedule 80 PVC pipe sections using socket connections at both ends.

What does SOC mean?

SOC identifies a socket-style connection designed to receive appropriately sized compatible PVC pipe.

What does EPDM identify?

EPDM identifies the specified sealing material used in the union and should be checked for compatibility with the intended application.

Why use a union connection?

A union provides a connection point that can be separated for access or servicing without requiring the adjoining pipe to be cut.

Do both ends use the same joining method?

Yes. Both socket connections use the applicable compatible PVC solvent-cement joining procedure.

What should I confirm before ordering?

Confirm the nominal size, SOC x SOC arrangement, Schedule 80 PVC compatibility, EPDM sealing requirements, and adjoining PVC pipe.

Important Ordering & Installation Notes

  • Inspect the union before use.
  • Confirm the nominal connection size.
  • Verify EPDM compatibility for the application.
  • Align adjoining piping before final assembly.
  • Allow clearance for future union servicing.
View AllClose

Reviews