Spears
Schedule 40 PVC Bullhead Tee Socket (SOC)
- Availability:
- Usually Ships Same Day
- Weight:
- 0.00 LBS
Description
Schedule 40 PVC Bullhead Tee Socket (SOC)
Schedule 40 PVC Bullhead Tee Socket (SOC) provides a three-way connection with a larger branch connection than the straight-through run. The socket openings receive appropriately sized compatible PVC pipe, allowing the fitting to combine a straight piping path with the specified bullhead branch configuration.
The bullhead tee configuration combines three socket connections within one Schedule 40 PVC fitting while providing the characteristic larger branch connection. Selection should account for all nominal sizes, Schedule 40 PVC compatibility, branch orientation, adjoining PVC pipe, joining requirements, piping alignment, support, and available installation clearance.
Product Highlights
- PVC construction
- Socket connections
- Schedule 40 design
- Bullhead tee configuration
- Three connection points
- Provides a larger branch connection
- Connects compatible PVC pipe sections
- Provides a three-way transition with a larger branch than the run connections
Technical Specifications
| Product Type | Bullhead Tee |
|---|---|
| Material | PVC |
| Schedule | Schedule 40 |
| Connection | Socket (SOC) |
| Connection Count | Three |
| Fitting Configuration | Bullhead Tee |
| Connection Interface | Compatible PVC Pipe |
| Connection Style | Socket Connections |
| Joining Method | Compatible PVC Solvent-Cement Joining |
| Piping Configuration | Three-Way Bullhead Branch Connection |
| Branch Configuration | Larger Branch than Run Connections |
| Primary Function | Provide a Three-Way Connection with a Larger Branch in Compatible Schedule 40 PVC Piping |
Bullhead Tee Design
The bullhead tee configuration provides three socket connections while using a larger branch connection than the straight-through run. This configuration allows compatible PVC piping to continue through the run while connecting a larger nominal branch at the center opening.
All connection sizes and the intended branch orientation should be identified before permanent assembly. Planning the tee position in advance helps coordinate adjoining pipe lengths, branch direction, nearby fittings, piping support, and available working clearance.
Socket Connections
The socket connections receive appropriately sized compatible PVC pipe according to the nominal size of each opening. Because the bullhead configuration uses different connection sizes, each socket should be matched to the correct adjoining pipe before permanent joining.
The mating pipe and socket surfaces should be prepared using the appropriate PVC solvent-cement joining procedure. Compatible joining materials, proper insertion, correct tee orientation, and careful alignment help establish the connections without placing unnecessary stress on the fitting.
Schedule 40 PVC Integration
The Schedule 40 PVC construction allows the bullhead tee to integrate into compatible Schedule 40 PVC piping arrangements requiring a larger branch connection. Matching all nominal sizes to the adjoining PVC pipe helps maintain the intended piping configuration.
Application suitability should be evaluated using the requirements of the complete piping system rather than the schedule designation alone. Intended service conditions, adjoining materials, connection compatibility, joining materials, installation environment, piping support, and applicable practices should all be considered during fitting selection.
Three-Way Bullhead Transition
A Schedule 40 PVC Bullhead Tee provides a three-way transition where the branch connection is larger than the straight-through run connections. This arrangement can be used where the piping layout specifically requires the larger size at the branch position.
Installation planning should consider all nominal sizes, socket insertion, branch orientation, adjoining pipe alignment, nearby fittings, available clearance, and piping support. Connected pipe should align naturally with the tee so the fitting is not relied upon to correct offsets or support improperly positioned piping.
Installation & Selection Considerations
- Confirm all nominal sizes.
- Verify the bullhead configuration.
- Check Schedule 40 PVC compatibility.
- Confirm the larger branch position.
- Match each socket to the correct adjoining pipe.

Our PVC fitting specialists can help review all nominal sizes, Schedule 40 requirements, bullhead configuration, larger branch position, adjoining PVC pipe, socket joining requirements, tee orientation, piping layout, support requirements, and available installation clearance before you order.
Frequently Asked Questions
What is a Schedule 40 PVC Bullhead Tee used for?
It provides a three-way connection where the branch connection is larger than the straight-through run connections.
What does SOC mean?
SOC identifies a socket-style connection designed to receive appropriately sized compatible PVC pipe.
What makes this a bullhead tee?
A bullhead tee has a branch connection that is larger than the straight-through run connections.
How many connections does this fitting have?
The bullhead tee has three socket connections arranged as a straight run with a center branch.
How are the socket connections assembled?
Compatible PVC pipe is joined using the appropriate PVC solvent-cement preparation and assembly procedure for the installation.
What should I confirm before ordering?
Confirm all nominal sizes, the bullhead branch arrangement, Schedule 40 PVC compatibility, adjoining PVC pipe sizes, and required tee orientation.
Important Ordering & Installation Notes
- Inspect all sockets before use.
- Confirm all nominal connection sizes.
- Prepare each pipe end correctly.
- Set the tee orientation before cementing.
- Use compatible PVC joining materials throughout.