Spears
Schedule 40 PVC 11-1/4° Elbow Socket (SOC)
- Availability:
- Usually Ships Same Day
- Weight:
- 0.00 LBS
Description
Schedule 40 PVC 11-1/4° Elbow Socket (SOC)
Schedule 40 PVC 11-1/4° Elbow Socket (SOC) provides a slight directional change for compatible Schedule 40 PVC piping where a smaller adjustment is needed than with common 22.5-degree, 45-degree, or 90-degree elbows. The socket connection configuration is designed to receive appropriately sized compatible PVC pipe for solvent-cement joining.
The 11-1/4-degree elbow configuration supports gradual piping alignment while maintaining a compact socket-style fitting arrangement. Selection should account for nominal size, Schedule 40 PVC compatibility, required bend angle, socket connections, adjoining pipe alignment, fitting orientation, joining materials, and available installation clearance.
Product Highlights
- PVC construction
- Socket connection
- Schedule 40 design
- 11-1/4-degree elbow
- Gradual directional transition
- Provides a slight change in piping direction
- Designed for compatible PVC solvent-cement joining
- Supports precise directional adjustments in Schedule 40 PVC piping
Technical Specifications
| Product Type | 11-1/4-Degree Elbow |
|---|---|
| Material | PVC |
| Schedule | Schedule 40 |
| Direction Change | 11-1/4 Degrees |
| Connection | Socket (SOC) |
| Fitting Configuration | Gradual-Angle Elbow |
| Connection Interface | Compatible PVC Pipe |
| Connection Style | Socket |
| Joining Method | Compatible PVC Solvent-Cement Joining |
| Piping Direction | Slight-Angle Transition |
| Installation Orientation | 11-1/4-Degree Directional Change |
| Primary Function | Provide a Gradual 11-1/4-Degree Change in Compatible PVC Piping |
11-1/4-Degree Elbow Design
The 11-1/4-degree elbow configuration provides a relatively small directional adjustment within a compatible PVC piping run. Its gradual angle can help route piping where only a slight change is required, avoiding the larger directional shift produced by commonly used 22.5-degree, 45-degree, or 90-degree elbows.
The required bend direction should be established before permanent joining so the elbow finishes in the intended position. Planning the fitting orientation in advance helps coordinate adjoining pipe lengths, nearby components, and support locations while maintaining the planned 11-1/4-degree transition through the piping layout.
Socket Connection
The socket connection provides a receiving interface for appropriately sized compatible PVC pipe. Proper pipe preparation and insertion are important during assembly because the final position of the elbow should correspond with the planned directional adjustment before the solvent-cement connections are completed.
The mating pipe and fitting surfaces should be prepared using installation practices appropriate for the PVC piping system. Compatible joining materials, adequate insertion, proper pipe alignment, and correct assembly procedures help establish the intended socket connections while limiting unnecessary mechanical stress on the completed elbow.
Schedule 40 PVC Integration
The Schedule 40 PVC construction allows the elbow to integrate into compatible Schedule 40 PVC piping arrangements requiring a slight directional transition. Matching the nominal size and socket configuration to the intended adjoining PVC piping helps maintain the planned connection sequence throughout the surrounding system.
Application suitability should be evaluated using the requirements of the complete piping system rather than the schedule designation alone. Intended service conditions, adjoining materials, connection compatibility, joining materials, installation environment, piping support, and applicable practices should all be considered during fitting selection.
Gradual Piping Alignment
A Schedule 40 PVC 11-1/4° Elbow can be used where a piping route requires a controlled adjustment without introducing a larger-angle turn. The slight directional change provides flexibility when coordinating pipe runs around layout conditions or when establishing a more gradual transition between aligned sections of compatible PVC piping.
Installation planning should consider socket engagement, pipe insertion, elbow orientation, nearby fittings, available working space, and independent support for adjoining piping. The connected pipe should approach each socket naturally so the elbow is not forced into position to compensate for an improperly aligned piping run.
Installation & Selection Considerations
- Confirm the nominal size.
- Verify the 11-1/4-degree angle.
- Check Schedule 40 PVC compatibility.
- Confirm the required socket connections.
- Match the elbow orientation to the piping route.

Our PVC fitting specialists can help review your nominal size, Schedule 40 requirements, 11-1/4-degree angle, socket configuration, adjoining PVC pipe, required directional adjustment, fitting orientation, joining requirements, piping layout, and available installation clearance before you order.
Frequently Asked Questions
What is this Schedule 40 PVC 11-1/4° Elbow used for?
It provides a slight 11-1/4-degree directional change within a compatible Schedule 40 PVC piping arrangement.
What does SOC mean?
SOC identifies a socket-style connection designed to receive appropriately sized compatible PVC pipe.
How much does this elbow change direction?
The elbow changes the piping direction by 11-1/4 degrees, providing a relatively gradual adjustment to the piping route.
Why use an 11-1/4-degree elbow?
It can be selected when the piping layout requires a smaller directional adjustment than would be provided by a larger-angle elbow.
What connects to the socket connection?
The socket receives appropriately sized compatible PVC pipe for the applicable solvent-cement joining procedure.
How are the socket connections assembled?
Compatible PVC pipe is joined using the appropriate PVC solvent-cement preparation and assembly procedure for the installation.
Should the elbow direction be set before cementing?
Yes. Establish the required 11-1/4-degree orientation before completing the permanent socket connections.
What should I confirm before ordering?
Confirm the nominal size, Schedule 40 PVC requirement, 11-1/4-degree angle, socket configuration, adjoining PVC pipe, required orientation, and installation layout.
Important Ordering & Installation Notes
- Inspect the sockets before use.
- Prepare both pipe ends correctly.
- Mark elbow position before cementing.
- Use compatible PVC joining materials.
- Support adjoining piping after final assembly.