Spears

Schedule 80 Reducing Tee (SOC x SOC x SOC)

(No reviews yet) Write a Review
Availability:
Usually Ships Same Day
Weight:
0.00 LBS
*Images are for visual reference only.
  • Schedule 80 Reducing Tee (SOC x SOC x SOC)
  • Spears Logo
  • Schedule 80 Reducing Tee (SOC x SOC x SOC)
$3.30 - $310.55

Represents the combined quantity sold of all the sizes under this product SKU.
Sold:
Frequently bought together:

Description

Schedule 80 Reducing Tee (SOC x SOC x SOC)

Schedule 80 Reducing Tee (SOC x SOC x SOC) provides a three-way socket connection while incorporating a reduction in nominal connection size. The socket openings receive appropriately sized compatible PVC pipe, allowing the fitting to provide a reducing branch transition within Schedule 80 PVC piping.

The reducing tee configuration combines three socket connections with different specified nominal sizes in one Schedule 80 PVC fitting. Selection should account for every connection size, Schedule 80 PVC compatibility, required reduction, branch orientation, joining requirements, piping alignment, support, and available installation clearance.

Product Highlights

  • PVC construction
  • Socket connections
  • Schedule 80 design
  • Reducing tee configuration
  • Three socket connection points
  • Provides a reducing branch connection
  • Connects compatible PVC pipe sections
  • Combines a three-way branch with a nominal size transition

Technical Specifications

Product Type Reducing Tee
Material PVC
Schedule Schedule 80
Connection Socket x Socket x Socket (SOC x SOC x SOC)
Connection Count Three
Fitting Configuration Reducing Tee
Connection Interface Compatible PVC Pipe
Connection Style Socket
Joining Method Compatible PVC Solvent-Cement Joining
Size Configuration Reducing
Piping Configuration Three-Way Reducing Branch Connection
Primary Function Provide a Reducing Three-Way Connection Within Compatible Schedule 80 PVC Piping

Reducing Tee Design

The reducing tee configuration provides a three-way connection while incorporating a change in nominal connection size. This allows compatible PVC piping to continue through the main run while connecting a branch or run section of the specified reduced size.

Every connection size and the intended branch orientation should be identified before permanent assembly. Planning the tee position in advance helps coordinate adjoining pipe lengths, branch direction, nearby fittings, piping support, and available working clearance.

Socket Connections

The socket connections receive appropriately sized compatible PVC pipe according to the nominal size of each opening. Because the fitting is reducing, each socket should be matched carefully to the correct adjoining pipe before permanent joining.

The mating pipe and socket surfaces should be prepared using the appropriate PVC solvent-cement joining procedure. Compatible joining materials, proper insertion, correct tee orientation, and careful alignment help establish the connections without unnecessary stress on the fitting.

Schedule 80 PVC Integration

The Schedule 80 PVC construction allows the reducing tee to integrate into compatible Schedule 80 PVC piping arrangements requiring a three-way size transition. Matching every nominal size and socket interface to the adjoining PVC pipe helps maintain the intended piping configuration.

Application suitability should be evaluated using the requirements of the complete piping system rather than the schedule designation alone. Intended service conditions, adjoining materials, connection compatibility, joining materials, piping support, and applicable practices should all be considered during fitting selection.

Reducing Branch Transition

A Schedule 80 Reducing Tee provides a compact way to combine a three-way branch connection with a change in nominal piping size. The SOC x SOC x SOC configuration maintains socket-style connections throughout the fitting.

Installation planning should consider every socket size, branch orientation, adjoining pipe alignment, nearby fittings, available clearance, and piping support. Connected pipe should align naturally so the fitting is not relied upon to correct offsets or support improperly positioned piping.

Installation & Selection Considerations

  • Confirm every nominal size.
  • Verify the required reduction.
  • Check Schedule 80 PVC compatibility.
  • Match each socket to the correct pipe size.
  • Confirm the tee orientation before final assembly.
Willy knows his pipe sizes
Ask Willy: Need Help Selecting a Schedule 80 Reducing Tee?

Our PVC fitting specialists can help review every nominal size, Schedule 80 requirements, SOC x SOC x SOC configuration, required reduction, adjoining PVC pipe, branch orientation, joining requirements, piping alignment, support requirements, and available installation clearance before you order.

Frequently Asked Questions

What is a Schedule 80 Reducing Tee used for?

It provides a three-way socket connection while incorporating a transition between different nominal PVC pipe sizes.

What does SOC x SOC x SOC mean?

It identifies socket-style connections at all three openings of the tee.

Why is this fitting called a reducing tee?

The fitting uses different specified nominal connection sizes to provide a size transition within the three-way connection.

How are the socket connections assembled?

Compatible PVC pipe is joined using the appropriate PVC solvent-cement preparation and assembly procedure.

Should every socket be the same size?

No. Because this is a reducing tee, the specified nominal socket sizes may differ according to the required piping transition.

What should I confirm before ordering?

Confirm every nominal size, SOC x SOC x SOC arrangement, Schedule 80 PVC compatibility, required reduction, and branch orientation.

Important Ordering & Installation Notes

  • Inspect all sockets before use.
  • Confirm every nominal connection size.
  • Verify the required reducing arrangement.
  • Prepare each pipe end correctly.
  • Set the tee orientation before final assembly.
View AllClose

Reviews