Spears

Schedule 40 PVC Reducing Tee (SOC x FPT)

(No reviews yet) Write a Review
Availability:
Usually Ships Same Day
Weight:
0.00 LBS
*Images are for visual reference only.
  • Schedule 40 PVC Reducing Tee (SOC x FPT)
  • Spears Logo
  • Schedule 40 PVC Reducing Tee (SOC x FPT)
  • Schedule 40 PVC Reducing Tee (SOC x FPT)
$0.68 - $145.46

Represents the combined quantity sold of all the sizes under this product SKU.
Sold:
Frequently bought together:

Description

Schedule 40 PVC Reducing Tee (SOC x FPT)

Schedule 40 PVC Reducing Tee (SOC x FPT) provides a three-way connection while transitioning between compatible PVC pipe and a male-threaded component. The socket connections receive appropriately sized compatible PVC pipe, while the FPT connection accepts a compatible male pipe thread.

The reducing tee configuration combines a branch transition with mixed socket and female-threaded connections in one Schedule 40 PVC fitting. Selection should account for all nominal sizes, Schedule 40 PVC compatibility, required reduction, branch orientation, adjoining components, joining requirements, piping alignment, and available installation clearance.

Product Highlights

  • PVC construction
  • Schedule 40 design
  • Reducing tee configuration
  • Socket x FPT connections
  • Provides a three-way transition
  • Combines socket and threaded interfaces
  • Connects compatible PVC pipe and male threads
  • Provides a reducing branch connection within compatible Schedule 40 PVC piping

Technical Specifications

Product Type Reducing Tee
Material PVC
Schedule Schedule 40
Connection Socket x Female Pipe Thread (SOC x FPT)
Connection Count Three
Fitting Configuration Reducing Tee
Socket Interface Compatible PVC Pipe
Threaded Interface Compatible Male Pipe Thread
Connection Style Socket x Female Threaded
Joining Method Compatible PVC Solvent-Cement Joining x Threaded Connection
Piping Configuration Three-Way Reducing Transition
Primary Function Provide a Reducing Branch Connection Between Compatible PVC Pipe and Male-Threaded Components

Reducing Tee Design

The reducing tee configuration provides a three-way connection while incorporating a change in connection size. This allows compatible PVC piping to continue through the main run while connecting a branch that transitions to the required threaded connection.

All connection sizes and the intended branch orientation should be identified before permanent assembly. Planning the tee position in advance helps coordinate adjoining pipe lengths, branch direction, nearby fittings, piping support, and available working clearance.

Socket & FPT Connections

The socket connections receive appropriately sized compatible PVC pipe, while the FPT connection accepts an appropriately sized compatible male pipe thread. Each connection should be matched to the intended adjoining component before permanent assembly.

The socket surfaces should be prepared for the applicable PVC solvent-cement joining procedure, while the threaded component should be started carefully and kept properly aligned. Compatible joining and thread-sealing materials should be selected for the respective connection types.

Schedule 40 PVC Integration

The Schedule 40 PVC construction allows the reducing tee to integrate into compatible Schedule 40 PVC piping arrangements requiring a three-way mixed-connection transition. Matching all nominal sizes and connection interfaces to the adjoining components helps maintain the intended piping configuration.

Application suitability should be evaluated using the requirements of the complete piping system rather than the schedule designation alone. Intended service conditions, adjoining materials, connection compatibility, joining materials, installation environment, piping support, and applicable practices should all be considered during fitting selection.

Three-Way Reducing Transition

A Schedule 40 PVC Reducing Tee with SOC x FPT connections provides a compact way to combine a branch connection, size transition, and mixed connection styles. The fitting can connect compatible PVC pipe while providing a female-threaded branch for a compatible male-threaded component.

Installation planning should consider all nominal sizes, socket insertion, thread engagement, branch orientation, adjoining component alignment, nearby fittings, and available clearance. Connected components should align naturally with the tee so the fitting is not relied upon to correct offsets or support improperly positioned piping.

Installation & Selection Considerations

  • Confirm all nominal sizes.
  • Verify the required reduction.
  • Check Schedule 40 PVC compatibility.
  • Match the socket and FPT positions correctly.
  • Confirm the tee orientation before final assembly.
Willy knows his pipe sizes
Ask Willy: Need Help Selecting a Schedule 40 PVC Reducing Tee?

Our PVC fitting specialists can help review all nominal sizes, Schedule 40 requirements, SOC x FPT configuration, required reduction, adjoining PVC pipe, mating male-threaded component, joining requirements, branch orientation, piping layout, and available installation clearance before you order.

Frequently Asked Questions

What is a Schedule 40 PVC Reducing Tee used for?

It provides a three-way connection while transitioning between compatible PVC pipe sizes and a male-threaded component.

What does SOC mean?

SOC identifies a socket-style connection designed to receive appropriately sized compatible PVC pipe.

What does FPT mean?

FPT means Female Pipe Thread and identifies an internally threaded connection designed to accept a compatible male pipe thread.

Why is this fitting called a reducing tee?

The fitting incorporates different connection sizes so the branch or adjoining connection can transition to the required size.

Do all connections use the same joining method?

No. The socket connections use the applicable PVC solvent-cement joining procedure, while the FPT connection uses a threaded mechanical connection.

What should I confirm before ordering?

Confirm all nominal sizes, the required reduction, SOC x FPT arrangement, Schedule 40 PVC compatibility, and adjoining components.

Important Ordering & Installation Notes

  • Inspect all connections before use.
  • Confirm all nominal connection sizes.
  • Prepare socket connections correctly.
  • Start the threaded component carefully by hand.
  • Set the tee orientation before final assembly.
View AllClose

Reviews