Spears

Schedule 40 PVC 90° Elbow (SOC x FPT)

(No reviews yet) Write a Review
Availability:
Usually Ships Same Day
Weight:
0.00 LBS
*Images are for visual reference only.
  • Schedule 40 PVC 90° Elbow (SOC x FPT)
  • Spears Logo
  • Schedule 40 PVC 90° Elbow (SOC x FPT)
  • Schedule 40 PVC 90° Elbow (SOC x FPT)
$0.40 - $22.40

Represents the combined quantity sold of all the sizes under this product SKU.
Sold:
Frequently bought together:

Description

Schedule 40 PVC 90° Elbow (SOC x FPT)

Schedule 40 PVC 90° Elbow (SOC x FPT) provides a 90-degree change in direction while transitioning between compatible PVC pipe and a male-threaded component. The socket end receives appropriately sized compatible PVC pipe, while the FPT end accepts a compatible male pipe thread.

The 90° elbow configuration combines a right-angle directional transition with mixed SOC x FPT connections in one fitting. Selection should account for nominal size, Schedule 40 PVC compatibility, socket and threaded positions, required direction change, adjoining components, joining requirements, piping alignment, and available installation clearance.

Product Highlights

  • PVC construction
  • Schedule 40 design
  • 90° elbow configuration
  • Socket x FPT connections
  • Provides a right-angle transition
  • Accepts compatible PVC pipe and male threads
  • Combines solvent-cement and threaded connections
  • Provides a 90° transition using mixed connection styles

Technical Specifications

Product Type 90° Elbow
Material PVC
Schedule Schedule 40
Connection Socket x Female Pipe Thread (SOC x FPT)
Connection Count Two
Fitting Configuration 90° Elbow
Socket Interface Compatible PVC Pipe
Threaded Interface Compatible Male Pipe Thread
Joining Method Compatible PVC Solvent-Cement Joining x Threaded Connection
Direction Change 90°
Piping Configuration Mixed-Connection Right-Angle Transition
Primary Function Provide a 90° Transition Between Compatible Socket and Male-Threaded Connections

90° Elbow Design

The 90° elbow configuration redirects compatible PVC piping through a right-angle change while incorporating two different connection styles. The socket end receives compatible PVC pipe, while the female-threaded opening accepts a compatible male-threaded component.

The intended elbow orientation should be established before final assembly so both connections align with the required piping route. Planning the fitting position helps coordinate adjoining components, nearby fittings, piping support, and available working clearance.

Socket & FPT Connections

The socket connection receives appropriately sized compatible PVC pipe, while the FPT opening accepts an appropriately sized compatible male pipe thread. Each side requires the appropriate assembly method for its connection style while the elbow establishes the required 90-degree transition.

The socket surfaces should be prepared for the applicable PVC solvent-cement joining procedure, while the threaded component should be started carefully and kept properly aligned. Compatible joining and thread-sealing materials help establish each connection without placing unnecessary stress on the elbow.

Schedule 40 PVC Integration

The Schedule 40 PVC construction allows the elbow to integrate into compatible Schedule 40 PVC piping arrangements requiring a mixed-connection 90-degree transition. Matching the nominal size and both connection interfaces to the adjoining components helps maintain the intended piping configuration.

Application suitability should be evaluated using the requirements of the complete piping system rather than the schedule designation alone. Intended service conditions, adjoining materials, connection compatibility, joining materials, installation environment, piping support, and applicable practices should all be considered during fitting selection.

Mixed-Connection 90° Transition

A Schedule 40 PVC 90° Elbow provides a direct right-angle transition between compatible PVC pipe and a male-threaded component. The SOC x FPT configuration combines the socket and female-threaded interfaces within one fitting where these different connection styles meet.

Installation planning should consider socket insertion, thread engagement, elbow orientation, adjoining component alignment, nearby fittings, and available clearance. Connected components should align naturally with the elbow so the fitting is not relied upon to correct offsets or support improperly positioned piping.

Installation & Selection Considerations

  • Confirm the nominal size.
  • Verify the required 90° transition.
  • Check Schedule 40 PVC compatibility.
  • Match the socket and FPT positions correctly.
  • Confirm the elbow orientation before assembly.
Willy knows his pipe sizes
Ask Willy: Need Help Selecting a Schedule 40 PVC 90° Elbow?

Our PVC fitting specialists can help review your nominal size, Schedule 40 requirements, SOC x FPT configuration, required 90° direction change, adjoining PVC pipe, mating male-threaded component, joining requirements, elbow orientation, piping layout, and available installation clearance before you order.

Frequently Asked Questions

What is a Schedule 40 PVC 90° Elbow used for?

It provides a 90-degree change in direction between compatible PVC pipe and a male-threaded component.

What does SOC mean?

SOC identifies a socket-style connection designed to receive appropriately sized compatible PVC pipe.

What does FPT mean?

FPT means Female Pipe Thread and identifies an internally threaded connection designed to accept a compatible male pipe thread.

How much does this elbow change the piping direction?

The elbow redirects the compatible piping arrangement through a 90-degree change in direction.

Do both connections use the same joining method?

No. The socket side uses the applicable compatible PVC solvent-cement joining procedure, while the FPT side uses a threaded mechanical connection.

What should I confirm before ordering?

Confirm the nominal size, SOC x FPT arrangement, Schedule 40 PVC compatibility, required 90° transition, adjoining PVC pipe, and mating male-threaded component.

Important Ordering & Installation Notes

  • Inspect both connections before use.
  • Confirm the nominal connection size.
  • Prepare the socket connection before cementing.
  • Start the threaded component carefully by hand.
  • Use compatible joining materials for each connection.
View AllClose

Reviews