Spears

Schedule 80 PVC Reducing Tee (Socket x FPT x Socket)

(No reviews yet) Write a Review
SKU:
803-095
Availability:
Usually Ships Same Day
Weight:
0.15 LBS
*Images are for visual reference only.
  • Schedule 80 PVC Reducing Tee (Socket x FPT x Socket)
  • Spears Logo
  • Schedule 80 PVC Reducing Tee (Socket x FPT x Socket)
$5.86

Represents the combined quantity sold of all the sizes under this product SKU.
Sold:
Frequently bought together:

Description

Schedule 80 PVC Reducing Tee (Socket x FPT x Socket)

Schedule 80 PVC Reducing Tee (Socket x FPT x Socket) provides a three-way connection while transitioning between compatible PVC pipe and a male-threaded branch component. The socket connections receive appropriately sized compatible PVC pipe, while the FPT branch accepts a compatible male pipe thread.

The reducing tee configuration combines two socket connections with a female-threaded branch connection in one Schedule 80 PVC fitting. Selection should account for all nominal sizes, Schedule 80 PVC compatibility, required reduction, branch orientation, adjoining components, joining requirements, piping alignment, and available installation clearance.

Product Highlights

  • PVC construction
  • Schedule 80 design
  • Reducing tee configuration
  • Socket x FPT x socket connections
  • Provides a three-way transition
  • Combines socket and threaded interfaces
  • Connects compatible PVC pipe and male threads
  • Provides a reducing threaded branch within compatible Schedule 80 PVC piping

Technical Specifications

Product Type Reducing Tee
Material PVC
Schedule Schedule 80
Connection Socket x Female Pipe Thread x Socket
Connection Count Three
Fitting Configuration Reducing Tee
Socket Interface Compatible PVC Pipe
Threaded Interface Compatible Male Pipe Thread
Connection Style Socket x Female Threaded x Socket
Joining Method Compatible PVC Solvent-Cement Joining x Threaded Connection
Piping Configuration Three-Way Reducing Branch Transition
Primary Function Provide a Reducing Threaded Branch Between Compatible Schedule 80 PVC Pipe Sections

Reducing Tee Design

The reducing tee configuration provides a three-way connection while incorporating a change in connection size at the branch. This allows compatible PVC piping to continue through the main run while connecting a male-threaded component at the female-threaded branch.

All connection sizes and the intended branch orientation should be identified before permanent assembly. Planning the tee position in advance helps coordinate adjoining pipe lengths, branch direction, nearby fittings, piping support, and available working clearance.

Socket & FPT Connections

The socket connections receive appropriately sized compatible PVC pipe at each end of the main run, while the FPT branch accepts an appropriately sized compatible male pipe thread. Each connection should be matched to the intended adjoining component before permanent assembly.

The socket surfaces should be prepared for the applicable PVC solvent-cement joining procedure, while the threaded branch component should be started carefully and kept properly aligned. Compatible joining and thread-sealing materials should be selected for the respective connection types.

Schedule 80 PVC Integration

The Schedule 80 PVC construction allows the reducing tee to integrate into compatible Schedule 80 PVC piping arrangements requiring a mixed-connection branch transition. Matching all nominal sizes and connection interfaces to the adjoining components helps maintain the intended piping configuration.

Application suitability should be evaluated using the requirements of the complete piping system rather than the schedule designation alone. Intended service conditions, adjoining materials, connection compatibility, joining materials, installation environment, piping support, and applicable practices should all be considered during fitting selection.

Reducing Threaded Branch Transition

A Schedule 80 PVC Reducing Tee with Socket x FPT x Socket connections provides a compact way to combine a straight socket-connected run with a reduced female-threaded branch. This arrangement allows compatible Schedule 80 PVC pipe to continue through the main run while connecting a threaded branch component.

Installation planning should consider all nominal sizes, socket insertion, thread engagement, branch orientation, adjoining component alignment, nearby fittings, and available clearance. Connected components should align naturally with the tee so the fitting is not relied upon to correct offsets or support improperly positioned piping.

Installation & Selection Considerations

  • Confirm all nominal sizes.
  • Verify the required reduction.
  • Check Schedule 80 PVC compatibility.
  • Match the FPT branch position correctly.
  • Confirm the tee orientation before final assembly.
Willy knows his pipe sizes
Ask Willy: Need Help Selecting a Schedule 80 PVC Reducing Tee?

Our PVC fitting specialists can help review all nominal sizes, Schedule 80 requirements, Socket x FPT x Socket configuration, required reduction, adjoining PVC pipe, mating male-threaded branch component, joining requirements, tee orientation, piping layout, and available installation clearance before you order.

Frequently Asked Questions

What is a Schedule 80 PVC Reducing Tee used for?

It provides a three-way connection while combining a straight socket-connected run with a reduced female-threaded branch.

What does FPT mean?

FPT means Female Pipe Thread and identifies an internally threaded connection designed to accept a compatible male pipe thread.

What connects to the socket openings?

The socket openings receive appropriately sized compatible PVC pipe for the applicable solvent-cement joining procedure.

Why is this fitting called a reducing tee?

The fitting incorporates a branch connection of a different nominal size, allowing the piping layout to transition at the tee.

Do all three connections use the same joining method?

No. The socket connections use the applicable PVC solvent-cement joining procedure, while the FPT branch uses a threaded mechanical connection.

What should I confirm before ordering?

Confirm all nominal sizes, Socket x FPT x Socket arrangement, Schedule 80 PVC compatibility, required reduction, and adjoining components.

Important Ordering & Installation Notes

  • Inspect all connections before use.
  • Confirm all nominal connection sizes.
  • Prepare both socket connections correctly.
  • Start the threaded branch component carefully by hand.
  • Set the tee orientation before final assembly.
View AllClose

Reviews