Description
Schedule 80 PVC Tee (FPT)
Schedule 80 PVC Tee (FPT) provides a three-way threaded connection between compatible male-threaded components. The female pipe-threaded openings accept appropriately sized compatible male pipe threads while establishing a branch connection within the piping layout.
The female-threaded tee configuration combines three FPT connection interfaces within one Schedule 80 PVC fitting. Selection should account for nominal size, Schedule 80 PVC compatibility, mating male threads, branch orientation, thread alignment, sealing requirements, piping support, and available installation clearance.
Product Highlights
- PVC construction
- Schedule 80 design
- Female pipe threads
- Tee configuration
- Three threaded connections
- Provides a three-way branch connection
- Accepts compatible male-threaded components
- Provides a threaded branch connection within compatible Schedule 80 PVC piping
Technical Specifications
| Product Type | Tee |
|---|---|
| Material | PVC |
| Schedule | Schedule 80 |
| Connection | Female Pipe Thread (FPT) |
| Connection Count | Three |
| Fitting Configuration | Tee |
| Threaded Interface | Compatible Male Pipe Thread |
| Connection Style | Female Threaded |
| Joining Method | Threaded Mechanical Connection |
| Piping Configuration | Three-Way Threaded Branch Connection |
| Branch Configuration | Threaded Branch |
| Primary Function | Provide a Three-Way Connection Between Compatible Male-Threaded Components |
Tee Design
The tee configuration provides three connection points within a single fitting for compatible threaded piping layouts. The branch opening provides a third connection direction while maintaining female-threaded interfaces throughout the fitting.
The tee orientation should be established before final assembly so all three threaded connections align with the intended piping route. Planning the fitting position helps coordinate adjoining components, branch direction, nearby fittings, piping support, and available working clearance.
Female-Threaded Connections
The FPT openings are designed to accept appropriately sized compatible male pipe threads at all three connection points. Each mating thread should be confirmed before assembly to ensure the nominal size and connection arrangement correspond with the intended installation.
Threaded components should be started carefully and kept properly aligned during assembly. Compatible thread-sealing materials and controlled installation help establish the connections while reducing unnecessary mechanical stress on the tee and adjoining components.
Schedule 80 PVC Integration
The Schedule 80 PVC construction allows the tee to integrate into compatible Schedule 80 PVC piping arrangements requiring a three-way threaded connection. Matching the nominal size and female-threaded interfaces to the adjoining components helps maintain the intended piping configuration.
Application suitability should be evaluated using the requirements of the complete piping system rather than the schedule designation alone. Intended service conditions, adjoining materials, thread compatibility, sealing materials, installation environment, piping support, and applicable practices should all be considered during fitting selection.
Three-Way Threaded Connection
A Schedule 80 PVC Tee (FPT) provides a direct three-way connection between compatible male-threaded components. The female-threaded configuration allows the main run and branch to connect using threaded mechanical interfaces.
Installation planning should consider thread engagement, branch orientation, adjoining component alignment, nearby fittings, available clearance, and piping support. Connected components should align naturally with the tee so the fitting is not relied upon to correct offsets or support improperly positioned piping.
Installation & Selection Considerations
- Confirm the nominal size.
- Verify all FPT connections.
- Check Schedule 80 PVC compatibility.
- Match all mating male threads correctly.
- Confirm the tee orientation before assembly.

Our PVC fitting specialists can help review your nominal size, Schedule 80 requirements, FPT connections, mating male-threaded components, branch orientation, thread compatibility, sealing requirements, piping alignment, support requirements, and available installation clearance before you order.
Frequently Asked Questions
What is a Schedule 80 PVC Tee (FPT) used for?
It provides a three-way threaded connection between compatible male-threaded components.
What does FPT mean?
FPT means Female Pipe Thread and identifies an internally threaded connection designed to accept a compatible male pipe thread.
How many connections does this tee have?
The tee provides three female-threaded connection points for the main run and branch.
What connects to the FPT openings?
The female-threaded openings accept appropriately sized compatible male-threaded components.
Does this tee require solvent cement?
No. The specified FPT connections use threaded mechanical connections rather than socket-style solvent-cement connections.
What should I confirm before ordering?
Confirm the nominal size, Schedule 80 PVC compatibility, FPT connection requirements, branch orientation, and mating male-threaded components.
Important Ordering & Installation Notes
- Inspect all threads before use.
- Confirm the nominal connection size.
- Verify all mating male threads.
- Start threaded components carefully by hand.
- Set the tee orientation before final assembly.